Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9 unique locations (119 components)

UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (14 components)

1.89MW Battery Storage located at United Utilities Preston

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan SA13 2PG (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (14 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Load curtailment at site
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Grafham Water Treatment Works, W Perry, Huntingdon PE28 0BZ (1 component)

1.26MW Battery Storage located at Anglian Water Grafham

Active • 2024-25 (T-4)
AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL6
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.09 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.32 MW
Loading map...
Showing 9 locations