Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

12 unique locations (170 components)

MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (15 components)

Load reduction on site supported by non-exporting standby generation. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4.77 MW
Marks & Spencer, 7 Market Street, Manchester, M1 1WT (11 components)
β€’ DSR Component providing load turn down at a retail store
β€’ Import/Export metering with diesel generation at a retail store
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
5.19 MW
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (11 components)
β€’ Load drop.
β€’ Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
3.61 MW
Asda Wolstanton, Chatterley Close, ST5 8LE (3 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
1.36 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA (8 components)
β€’ Load reduction on site supported by standby generation
β€’ Standby generation reducing load
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
4.99 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
2.69 MW
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
β€’ Load drop
β€’ Load reduction on flexible electricity consuming processes
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
3.61 MW
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
3.14 MW
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)

Load reduction on flexible electricity consuming processes (3)

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
3.61 MW
ACS&T - Tewkesbury - Site 2, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
23.98 MW
ACS&T - Tewkesbury - Site 1, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (15 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
24.18 MW
100 Montifichet Road, Westfield, Stratford E20 1GR (60 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
843.06 MW
Loading map...
Showing 12 locations