Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

24 unique locations (200 components)

36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.32 MW
AL6 (51 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
DSR EV Charging Rejected AL6
Active • 2027-28 (T-4), 2025-26 (T-4) ...
103.09 MW
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.56 MW
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Datchet 2 Raw Water PS, Horton Road, Datchet, Slough, United Kingdom, SL3 9HX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (8 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-4) ...
Staines Raw Water PS, Birch Green, , Staines, United Kingdom, TW18 4HA (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 component)

Permitted Onsite Generator located at Waste Water Treatment works

Active • 2025-26 (T-4)
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
The Mount, Virginia Water, Surrey, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (14 components)

1.89MW Battery Storage located at United Utilities Preston

Active • 2026-27 (T-4), 2025-26 (T-4) ...
WATER LANE, PURFLEET, ESSEX, RM19 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
WATER PUMP STATION, HIGH ROAD, ASHTON KEYNES, SWINDON, SN6 6NX (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1)
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 24 locations