DSR (Demand Side Response)
24 unique locations (200 components)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (5 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)
AL6 (51 components)
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Asda Chorley Ringway, Water Street , Chorley, PR7 1EX (10 components)
Chingford South Raw Water PS, Lea Valley Road, Enfield, London, United Kingdom, E4 7PX (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Corrie Gardens, VIRGINIA WATER, SURREY, GU25 (10 components)
EV charging on residential premises
Datchet 2 Raw Water PS, Horton Road, Datchet, Slough, United Kingdom, SL3 9HX (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (8 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)
EV charging on residential premises
KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Littleton Raw Water PS, Ashford Road, , Staines, United Kingdom, TW18 1RU (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Lockwood Shaft Raw Water, Ferry Lane, Waltham Forest, London, United Kingdom, N17 9NF (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (8 components)
Water source heat pumps at 1748kW each
Staines Raw Water PS, Birch Green, , Staines, United Kingdom, TW18 4HA (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 component)
Permitted Onsite Generator located at Waste Water Treatment works
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PE (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PE (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
The Mount, Virginia Water, Surrey, GU25 (12 components)
EV charging on residential premises
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (10 components)
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (14 components)
1.89MW Battery Storage located at United Utilities Preston
WATER LANE, PURFLEET, ESSEX, RM19 (12 components)
EV charging on residential premises
WATER PUMP STATION, HIGH ROAD, ASHTON KEYNES, SWINDON, SN6 6NX (2 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
WELLINGTON AVENUE, VIRGINIA WATER, SURREY, GU25 (12 components)
EV charging on residential premises