Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

1947 unique locations (54042 components) - Page 1 of 78

ZE2 (14 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
42.25 MW
YO8 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
171.01 MW
YO7 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
110.08 MW
YO61 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
64.27 MW
YO51 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
84.51 MW
YO43 (15 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
94.19 MW
YO42 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
43.47 MW
YO41 (28 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
110.82 MW
YO32 (30 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
103.05 MW
YO31 (17 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
29.12 MW
YO30 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
82.99 MW
YO26 (43 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
104.74 MW
YO25 (52 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
166.36 MW
YO24 (27 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
99.95 MW
YO23 (27 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
68.97 MW
YO21 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
54.41 MW
YO19 (37 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
131.88 MW
YO16 (15 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
54.10 MW
YO15 (17 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
40.06 MW
YO14 (10 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
21.13 MW
YO12 (20 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
29.98 MW
YO1 (2 components)

Domestic EV

Active • 2025-26 (T-1), 2025-26 (T-4)
4.79 MW
WV9 (6 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
19.79 MW
WV8 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
78.25 MW
WV6 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
152.26 MW
Loading map...
Showing 25 locations