DSR (Demand Side Response)

5 unique locations (132 components)

Asset is yet to be procured / allocated (3 components)

Asset is yet to be procured / allocated

Active • 2028-29 (T-4)
62.61 MW
Component has yet to be procured/allocated (52 components)

Component has yet to be procured/allocated

Active • 2028-29 (T-4), 2025-26 (T-1)
1090.00 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.83 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
29.08 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
44.21 MW
Loading map...
Showing 5 locations