Asda Redditch, Jinnah Road, Redditch, B98 7ER (11 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.08 MW
BALL BEVERAGE PACKAGING, MAYNARD ROAD, EAST SEGRO PARK, BURTON LATIMER, KETTERING, NN15 5ZS (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Baunton WTW, A435, Baunton, Cirencester, United Kingdom, GL7 7BQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (7 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• The CMU Component reduces import demand by turning on back up generation.
Active • 2027-28 (T-4), 2020-21 (T-1) ...
2.36 MW
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)
• Gas fired generating units
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
4.50 MW
Berry, Corby BMS Sallow Road, Weldon Industrial Estate, Corby, Northamptonshire, NN17 5JX (5 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Bond Avenue Bletchley Milton Keynes MK1 1JJ (19 components)
• Component has yet to be procured.
• The CMU component comprises of three 2MW Reciprocating Gas Engines
Active • 2028-29 (T-4), 2022-23 (T-4) ...
17.74 MW
Brackley STW, BRACKLEY STW (NEW), Turweston Field, BRACKLEY Northamptonshire, NN13 5JB, (6 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (17 components)
• New build battery storage.
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
31.11 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.64 MW
DEANSHANGER HL, DEANSHANGER HL, DEANSHANGER, MILTON KEYNES, MK19 6BJ, (7 components)
• The CMU Component reduces import demand by turning on back up generation.
• Unproven DSR Component
Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
DUSTON MILL-PITSFORD WA, DUSTON MILL RIVER INTAKE, NN5 6ER (19 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.68 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
7.97 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
EMR Cardiff (Roath Dock), Dowlais Wharf, Dowlais Wharf, CF10 4ED (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW
EMR East Tilbury, Low Street Brickworks, Station Road, East Tilbury , RM18 8QR (22 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.67 MW
EMR Kingsbury, Trinity Rd, Tamworth, B78 2LB (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.64 MW
EMR Landor Street , Landor Street, Nechells , B8 1AF (22 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.84 MW
EMR Northampton, Harvey Reeves Road, Northampton, NN5 5JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-4) ...
11.42 MW
EMR Norwich, Atlas Works, Norwich Rd, Lenwade, Morton on the Hill, Norwich, NR9 5SN (12 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.22 MW
EMR Smethwick, Downing Street, Smethwick, West Midlands , B66 2PG (25 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.28 MW
Farmoor WTW, Cumnor Road, Farmoor, Oxford, United Kingdom, OX2 9NS (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1)
4.09 MW