Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3 unique locations (19 components)

Bicker Bar, Swineshead, Boston, Lincolnshire, PE20 3AN (5 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Cadney Carrs WPS 1, CADNEY CARRS WPS, Brigg Road, Cadney, BRIGG South Humberside, DN20 9HP, (7 components)
• A New Build 8MW Gas Fuelled Generating Station.
• The CMU Component reduces import demand by turning on back up generation.
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
123.20 MW
LONG ACRE FARM, BIRTLEY, CHESTER LE STREET, DH3 1RQ. (Nearest postcode to grid reference: NE9 7UA). (7 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Component has yet to be procured.
• Gas peaking reciprocating engine
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 3 locations