10 unique locations (333 components)

Deansford Lane, DY10 4NB (15 components)
• A new build 11MW battery storage system
• Battery system installed at Emirates Stadium
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.54 MW
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (166 components)
• GT3
• Genset 1.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
13899.76 MW
FORREST FARM, CALDERCRUIX, AIRDRIE, LANARKSHIRE, ML6 8NX (6 components)
• Cruachan pump storage hydro plant - Unit 3
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU component will comprise containerised gas engines, transformers, a swithgear building, gas kiosk, DNO switch room, and communications devices for control of the asset all in a compound secured by an acoustic fence.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (31 components)
• Battery energy storage unit
• CHP at a horticultural environment.
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.86 MW
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• Generating Unit 2
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
46.94 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (15 components)
• 4MW battery co-located with a solar farm
• 8.3MW Gas Turbine installation
• Unit 3 Cruachan pump storage hydro plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
7.47 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
41.74 MW
Wheldale Generation Site Wheldon Road Castleford West Yorkshire WF10 2RT (7 components)
• Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network
• Commercial sites
• Gas reciprocating engines.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
6.38 MW
Loading map...
Showing 10 locations