DSR (Demand Side Response)

2 unique locations (42 components)

Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
FORREST FARM, CALDERCRUIX, AIRDRIE, LANARKSHIRE, ML6 8NX (6 components)
• Cruachan pump storage hydro plant - Unit 3
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU component will comprise containerised gas engines, transformers, a swithgear building, gas kiosk, DNO switch room, and communications devices for control of the asset all in a compound secured by an acoustic fence.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 2 locations