Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

46 unique locations (288 components) - Page 1 of 2

150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
12.95 MW
670 Ajax Avenue, Slough, SL1 4BG (4 components)

DSR Component providing load turn down at a data centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.16 MW
Ajax Avenue, 670 Ajax Avenue, Slough, SL1 4BG (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW
Billerudkorsnäs Beetham Ltd Waterhouse Mills Beetham, Milnthorpe Cumbria LA7 7AR (2 components)

Load Shedding - This DSR component is a paper manufacturing site, which can reduce its power demand by control of its manufacturing process

Inactive • 2018-19 (T-1)
3.88 MW
Broomhouse Lane, Edlington, Doncaster, DN12 1ES (3 components)
• DSR Component providing load turn down at a manufacturing site
• DSR Component providing load turn down at a piping systems manufacturing site
Inactive • 2021-22 (T-4), 2020-21 (T-1)
5.18 MW
Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (1 component)

DSR component offering flexibility delivered by load turn down at a data centre

Inactive • 2021-22 (T-4)
25.90 MW
Centro 3, Maxted Close, Hemel Hempstead, Hertfordshire, HP2 7SU (2 components)

Back up generation at a data centre

Inactive • 2018-19 (T-1)
10.36 MW
Centro 3, Maxted Close, Hemel Hempstead, Herts, HP2 7SU (4 components)

DSR Component providing load turn down at a data centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.16 MW
Gyron Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (2 components)

Large data centre with back up generator on site

Inactive • 2018-19 (T-1)
8.63 MW
Holmes Way, Boston Road Ind Est, Horncastle, LN9 6JW (4 components)

DSR Component providing load turn down at a manufacturing site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.16 MW
Holmes Way, Boston Road Ind.Est. Horncastle, LN9 6JW (2 components)

DSR Component providing load turn down at a piping systems manufacturing site

Inactive • 2020-21 (T-1)
1.72 MW
Holmes Way, Boston Road Industrial Estate, Horncastle, LN9 6JW (2 components)

DSR component providing load turn down at a manufacturing site

DSR E.ON UK PLC Conditional LN9
Inactive • 2022-23 (T-4), 2022-23 (T-3)
3.02 MW
James Jones, Lockerbie Sawmill, Stevenscroft, Lockerbie, DG11 2SQ (1 component)

DSR component providing load turn-down at a timber saw mill

Inactive • 2020-21 (T-1)
3.45 MW
Marks and Spencer, 16-18 Stall Street, Bath, BA1 1QB (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, 35 Deansgate, Bolton, BL1 1HQ (9 components)
• DSR Component providing load turn down at a retail store
• DSR component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
DSR E.ON UK PLC Conditional BL1
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.84 MW
Marks and Spencer, 37 Mill Lane, Solihull, B91 3AT (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, 39 High Street, Worcester, WR1 2QN (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, Bluewater Pkwy, Dartford, Greenhithe DA9 9SD (5 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, Brookfield Centre, Halfhide Lane, Cheshunt, EN8 0TZ (5 components)

Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, Coppice Way, Handforth, Wilmslow, SK9 3PB (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, Holmbush Centre, Upper Shoreham Road Shoreham-by-Sea, BN43 6TD (6 components)

DSR component providing load turn down at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Marks and Spencer, Holmbush Centre, Upper Shoreham Road, Shoreham By Sea, BN43 6TD (1 component)

DSR Component providing load turn down at a retail store

Inactive • 2021-22 (T-4)
2.16 MW
Marks and Spencer, Holmbush Centre, Upper Shoreham Road, Shoreham by the Sea, BN43 6TD (2 components)

DSR component providing load turn down at a retail store

DSR E.ON UK PLC Conditional BN43
Inactive • 2022-23 (T-4), 2022-23 (T-3)
1.02 MW
Marks and Spencer, Oxford Street, Swansea, SA1 3BB (6 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.45 MW
Loading map...
Showing 25 locations