DSR (Demand Side Response)

677 unique locations (6279 components) - Page 1 of 28

Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (7 components)

3 x 1.6MW POSGU (standby generation)

Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Unit 1 Carter Square, Uttoxeter, ST14 8EU (1 component)

Load curtailment from refridgeration

Active β€’ 2028-29 (T-4)
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (7 components)
β€’ Water Source Heat Pumps at 1748KW each (x2)
β€’ Water source heat pumps at 1748kW each
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (5 components)

Water source heat pumps at 1748kW each (2)

Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
2.45 MW
Saltend Lane, HULL, HU12 8PP (25 components)
β€’ Load reduction
β€’ Load reduction on site
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Neachley Ln, Shifnal TF11 8PQ (13 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (14 components)

Load reduction on site supported by non-exporting standby generation. (3)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
7.93 MW
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (7 components)

2 x POSGU (each 1MW)

Inactive β€’ 2021-22 (T-4), 2020-21 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (22 components)

load curtailment at site

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
12.59 MW
London Road, Redhill, Surrey RH1 1LJ (3 components)

2 x POSGU , each 0.8MW

Inactive β€’ 2021-22 (T-4), 2018-19 (T-1)
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (13 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)

Mix of load reduction and standby generation

Inactive β€’ 2022-23 (T-4), 2021-22 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (12 components)
β€’ Load curtailment at site
β€’ Load curtailment at site with standby generation exporting
β€’ Standby generation
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
β€’ Water source heat pump at 1883kW each (2)
β€’ Water source Heat Pumps at 1883KW each
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
2.73 MW
Harbour House, Marine Parade Dover Kent CT17 9BU (5 components)
β€’ Multiple POSGUs (standby diesel generators).
β€’ Sixteen POSGUs (standby diesel generators).
Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Goudhurst Pumping Station, Bluecoats Lane, Cranbrook, TN17 1HB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
Gogar Station Road, Gogarburn Edinburgh EH12 9SB (2 components)
β€’ Four POSGUs (standby diesel generators) each having 1.4MW capacity.
β€’ Four POSGUs (standby generators) each having 1.4MW capacity.
Inactive β€’ 2022-23 (T-4), 2021-22 (T-4)
Godmersham Pumping Station, Canterbury Road, Canterbury, CT4 7DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive β€’ 2022-23 (T-4), 2020-21 (T-4) ...
George at Asda, Atherleigh Way WN7 5RZ (8 components)
β€’ Load curtailment from refridgeration
β€’ Load drop
Active β€’ 2028-29 (T-4), 2025-26 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
β€’ Load drop
β€’ Load drop by on-site generation
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations