Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

98 unique locations (633 components) - Page 1 of 4

YWA WESTERN, COPLEY STW WAKEFIELD, COPLEY, HALIFAX, WEST YORKSHIRE, HX 0TL (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
WOODHAM WALTER PUMPING STATION, LITTLE BADDOW ROAD, WOODHAM WALTER, MALDON , CM9 6RU (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
WHITTLE DENE T/W, HARLOW HILL, NEWCASTLE UPON TYNE,NON PAF ADDRESS, NE15 0 (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Whatley, Frome, Somerset, BA11 3LF (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
West Lane, Ellistown, Coalville, Leicestershire, LE67 1FA (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Weighbridge Road, Shotton, Deeside, CH5 2LL (14 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (11 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.58 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (11 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (14 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
208.85 MW
TWERTON PUMP STN, MIDLAND ROAD DEPOT, BATH, BA2 3BS (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
To be determined (77 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

DSR Do Not Use Not Prequalified
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
0.23 MW
TA9 3QG (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Stockport Metropolitan Borough Council, Stopford House, Edward Street, Stockport, SK1 3UR (5 components)

Stockport DSR

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
STEVENSTON SEWAGE TREATMENT WORKS, LUNDHOLM ROAD,STEVENSTON, AYRSHIRE,KA20 3LJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
St. Alban's Road Watford Herts WD24 7RG (5 components)

Commercial printers

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Staithes Road, Preston, Hull, HU12 8TB (23 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.24 MW
Loading map...
Showing 25 locations