Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

101 unique locations (455 components) - Page 1 of 5

11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
1.09 MW
133 Balornock Road, Glasgow, G21 3UW (16 components)

Generators on hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
45.47 MW
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (4 components)

3 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
10.11 MW
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
6.74 MW
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (2 components)

0.27MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
0.42 MW
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
3.59 MW
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (3 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
BREACH FARM, CADLEY LANE, SWADLINCOTE, DERBYSHIRE, DE12 6RJ (4 components)

10 MW demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Brook Farm PV (DZS653A01) North Bradley Trowbridge Wiltshire BA14 9BT (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (9 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional LA23
Inactive • 2022-23 (T-4), 2019-20 (T-1)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (2 components)

0.2MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (8 components)
• 0.250MW Battery Energy Storage System
• 0.25MW of Demand Reduction
• 5MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Clowne Rd, Stanfree, Chesterfield, S44 6AG (6 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Commerical Road, Wolverhampton, WV1 3RD (3 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
ELECTRICITY SUB STATION AT JUNCTION OF W WOODMAN CLOSE LEIGHTON BUZZARD LU7 3NT (3 components)

6 MW storage battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (5 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations