Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

175 unique locations (1890 components) - Page 1 of 7

WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (1 component)

1MW of demand reduction

Inactive • 2021-22 (T-4)
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (11 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
WATERSIDE BELMONT 10 WATERSIDE, BELMONT, BOLTON, LANCASHIRE, BL7 (17 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
52.13 MW
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wansford Intake, WANSFORD INTAKE,  Track Off A47,  Sutton,  STAMFORD Lincolnshire,  PE8 6PN, (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.37 MW
Unit 4 01-May Davygate North Yorkshire Great Britain YO1 8QR (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Unit 14 10 Paternoster Square Great Britain EC4M 7DX (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Unit 1 11 Dalgety Drive Renfrewshire Great Britain PA7 5LN (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Unit 10 Salendine Shopping Centre 144 Moor Hill Road Salendine Nook West Yorkshire Great Britain HD3 3XA (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Unit 10 Moray Park Meadowbank Retail Park Marrionville Rd Great Britain EH7 5TF (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
Unit 10 263 Banbury Road Summertown Oxfordshire Great Britain OX2 7HN (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-1), 2025-26 (T-4)
UB10 (42 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
173.42 MW
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (8 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (5 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (6 components)

2MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
Tinwell Intake, TINWELL INTAKE, Private road off Tinwell Road, (goes to business park) Tinwell, STAMFORD Lincolnshire, PE9 3UD, (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (17 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2022-23 (T-4) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (14 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (1 component)

0.8MW demand reduction

Inactive • 2021-22 (T-4)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (6 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (6 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (11 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations