Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

138 unique locations (433 components) - Page 1 of 6

WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (6 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (2 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (1 component)

19 MW of demand reduction

DSR LIMEJUMP LTD Conditional
Inactive • 2019-20 (T-1)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (6 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional
Inactive • 2019-20 (T-1)
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)

2MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (1 component)

0.8MW demand reduction

Inactive • 2018-19 (T-1)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
SUBSTATION 2, LITTLEBROOK BATTERY STORAGE, ALBION ROAD, DARTFORD, KENT, DA1 5PZ (6 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Stroud Green Lane, Fareham, PO14 2HS (4 components)

40MW of Demand Reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (10 components)
• 0.250 MW of demand reduction
• 2MW of DSR
• DSR turn down
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (2 components)
• 0.250 MW of demand reduction
• 2MW of DSR
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Seamer Carr Landfill Seamer Scarborough YO12 4QA (2 components)
• 3 MW of DSR
• 3 MW of demand reduction
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Loading map...
Showing 25 locations