DSR (Demand Side Response)

10 unique locations (103 components)

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (67 components)
• A gas engine CHP site providing electricity & heat to the associated development
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
• Load reduction on site supported by non-exporting standby generation.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.16 MW
Land North of Clayhill Farm Westoning MK45 5JD (4 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
• Load reduction on site supported by non-exporting standby generation.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (3 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hungerford Farm, Winchfield, Hook RG27 8SW (2 components)

5.4 MW of battery storage units across different sites

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (2 components)

9.8 MW Storage facility located at Swadlincote

Inactive • 2018-19 (T-1)
Breach Farm, Cadley Lane, Caldwell, Swadlincote DE12 6RJ (1 component)

9.8 MW Storage facility located at Swadlincote

Inactive • 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (2 components)

5.2MW of batteries across several sites

Inactive • 2018-19 (T-1)
Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (1 component)

5.2MW of batteries across several sites

Inactive • 2018-19 (T-1)
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• 24.95 MW of Battery Storage located at Waterlooville.
• Load curtailment on site and standby generation
• Load curtailment via standby generation exporting excess
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...