DSR (Demand Side Response)

14 unique locations (70 components)

Asda Bristol CDC Distribution Centre, St Andrews Road, Kings Weston Lane BS11 9FG (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.21 MW
Avon Close, Weston-Super-Mare, BS23 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Bridwell Road, Weston Mill, Plymouth, Devon, PL5 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
BWW012, Banwell Spring, Banwell Spring Pumping Station, Banwell, Weston Super Mare, BS29 6EA (15 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Daley Close, Weston-super-Mare, Somerset, BS22 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Hillside West, Hutton, Weston-super-Mare, Somerset, BS24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Humbly Grove Energy Ltd, Weston Common, The Avenue, Lasham, The Avenue, Alton Hants, GU34 5SY (1 component)

On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)

Active • 2025-26 (T-1)
Humbly Grove, Weston Common, The Avenue, Lasham, Alton, Hants, GU34 5SY (2 components)

On-site back-up generation which reduces site consumption and exports excess to distribution network

Active • 2027-28 (T-4), 2024-25 (T-1)
Land North of Clayhill Farm, Westoning, MK45 5JD (8 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.40 MW
Milton Road, Weston Super Mare, Weston Super Mare, BS22 8AA (14 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR P3P Partners LLP Not Prequalified BS22
Active • 2024-25 (T-4), 2023-24 (T-1) ...
n/a (5 components)

n/a

Active • 2025-26 (T-4)
Snowdon Vale, Weston-super-Mare, Somerset, BS23 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
The Street, Coney Weston, Bury St. Edmunds, IP31 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Weston Close, Upton Grey, Basingstoke, RG25 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...