Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9 unique locations (58 components)

111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station) (2)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
522.25 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW. (2)
• N/A
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.87 MW
Asda Boston, Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (5 components)

Load reduction on site supported by non-exporting standby generation. (3)

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
2.37 MW
Asda Tamworth, 91 Chesterfield Rd, Lichfield WS13 6QW (3 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.36 MW
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (3 components)

Gowanbank Water Pumping Station

Inactive • 2021-22 (T-4), 2018-19 (T-1)
1.01 MW
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)

London School of Hygiene & Tropical Medicine - DSR

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
14.55 MW
Lunar Freezing - Fraserburgh, 46-50 Shore St, Fraserburgh AB43 9BT, UK (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
0.28 MW
Rougham Industrial Estate, Horizon House, Fred Castle Way, Bury St Edmunds, Rougham IP30 9ND, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (5)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.03 MW
Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.24 MW
Loading map...
Showing 9 locations