Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

57 unique locations (363 components) - Page 1 of 3

KING GEORGE V RAW WATER PS, THAMES WATER PUMPING STATION, LEA VALLEY ROAD, CHINGFORD, E4 7PX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
KGV Pumping Station, East Camperdown Road, Dundee, DD1 3LG (2 components)

Water pumping station comprising of electrical pumps that can be modulated or turned off.

Inactive • 2022-23 (T-4)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (6 components)

Mix of load reduction and standby generation

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (4 components)

Hungry Snout Water Pumping Station

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (2 components)

Hungry Snout Water Pumping Station

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Holly Water Close, Torquay, TQ1 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (14 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Load curtailment at site
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HEATH RISE, VIRGINIA WATER, SURREY, GU25 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
HEATH RISE VIRGINIA WATER SURREY GU25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Grafham Water Treatment Works, W Perry, Huntingdon PE28 0BZ (1 component)

1.26MW Battery Storage located at Anglian Water Grafham

Active • 2024-25 (T-4)
Gowanbank TWP Gowanbank Armadale Bathgate (2 components)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (1 component)

Gowanbank Water Pumping Station

Inactive • 2019-20 (T-1)
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (5 components)

Glenhove Water Pumping Station

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (1 component)

Glenhove Water Pumping Station

Inactive • 2019-20 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Francis Avenue Bournemouth BH11 8NX (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Francis Avenue Bournemouth BH11 8NX (1 component)

Water treatment centre

Inactive • 2019-20 (T-1)
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (4 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations