Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84020 components) - Page 10 of 397

WN3 (13 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
WN2 (20 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.10 MW
WN1 (6 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.15 MW
W Marsh Rd, Spalding, PE11 2BB, United Kingdom (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2021-22 (T-1)
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WITTON COURT NEWCASTLE UPON TYNE NE3 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WITNEY LANE FARM WITNEY LANE EDGE MALPAS CHESHIRE SY14 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Withins Road Warrington Cheshire WA3 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Withinlee Road PRESTBURY MACCLESFIELD CHESHIRE SK10 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Wishing Tree Road, St. Leonards-on-Sea, East Sussex, TN38 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wisborough Road, Southsea, PO5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WINTERS WAY HOLMER GREEN HIGH WYCOMBE BUCKINGHAMSHIRE HP15 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WINTER'S PLACE EASTLEIGH HAMPSHIRE SO50 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WINTERS FIELD TAUNTON SOMERSET TA1 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
winter lane west hanney wantage OX12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
WINTERHILL CLOSE LIVERPOOL L18 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
WINTER CRESCENT LYDNEY GL15 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WINSTANLEY LANE SHENLEY LODGE MILTON KEYNES MK5 (25 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Winstanley Lane Shenley Lodge Milton Keynes MK5 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
WINSTANLEY LANE SHENLEY LODGE MILTON KEYNES BUCKINGHAMSHIRE MK5 (8 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
WINNIPEG PLACE LEEDS LS7 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (10 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
WINDYEDGE DRIVE PERTH PH2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Windy Bank Lancashire Great Britain BB8 9HY (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations