Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

851 unique locations (4194 components) - Page 10 of 35

Oxcroft, Clowne Rd, Stanfree, Chesterfield, S44 6AG (2 components)

0.8 MW of demand reduction

Inactive • 2019-20 (T-1)
OX49 (2 components)

Domestic demand turn down

Active • 2027-28 (T-4)
0.08 MW
OSWESTRY, Broomhall Lane, UK , SY10 7HQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Osprey, Dunslow road, Eastfield, Scarborough, North Yorks, YO11 3UT (3 components)

BTM battery

Inactive • 2019-20 (T-1), 2018-19 (T-1)
OLD STRATFORD WB, OLD STRATFORD WB, Crosgrove Road, Old Stratford, MILTON KEYNES, MK19 6BB, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Oaks Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (5 components)
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Oak House Bndgewater Road Wardon Worcestershire WR4 9FP (2 components)

Embedded diesel generator at Oak House site

Inactive • 2018-19 (T-1)
N W W PLC, HERON BRIDGE INTAKE, HERON PARK, CHESTER, CHESHIRE, CH3 5SN (2 components)

0.4MW of demand reduction

DSR LIMEJUMP LTD Conditional CH3
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Not Applicable (4 components)

Turn down DSR

Active • 2028-29 (T-4)
North Walsham STW, NORTH WALSHAM STW, Marshgate, NORTH WALSHAM Norfolk, NR28 9LG, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Northumbrian Water Plc Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

2 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
North Pickenham WTW, NORTH PICKENHAM WW, Track off by Hawthorn Lodge, North Pickenham, SWAFFHAM Norfolk, PE37 8DX (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
North Hykeham STW, NORTH HYKEHAM STW, Brant Road, LINCOLN, LN5 9AJ, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Northfleet Works, The Shore, Northfleet, Gravesend DA11 9AN (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
North Ferry STW, NORTH FERRY STW, Lincoln Castle Way, New Holland, BARROW-UPON-HUMBER South Humberside, DN19 7JG, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Northern Steel Stocks, Cross Street, Wolverhampton, WV1 2HS (11 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (5 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
North Dalton Pumping Station Dalton-le-Dale Seaham County Durham SR7 8PY (3 components)

0.29MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Northampton River SP, Northampton-Riverside Museum Way, Fairground Way, Riverside Business Park, NORTHAMPTON, NN3 9HU, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Norbord Europe Limited Morayhill Dalcross Inverness IV2 7JQ (5 components)

4MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Non PAF, Feeder Pillar 1 (W9920) Brookfield Park Manvers Way Wath-Upon-Dearne Rotherham R63 5DJ (2 components)

3.050MW of DSR

DSR Portman Power Limited Not Prequalified W9
Inactive • 2023-24 (T-4), 2022-23 (T-3)
NMB minebea ltd, Doddington road, linc, LN6 3RA (3 components)

BTM Battery

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Next plc Brookfield Park Manvers Way Wath-Upon-Dearne Rotherham S63 5DJ (2 components)

3 MW of demand reduction

DSR LIMEJUMP LTD Conditional S63
Inactive • 2022-23 (T-4), 2019-20 (T-1)
New Winning Pumping Station CastleEden Hartlepool Cleveland, TS27 4TF (3 components)

3 MW of demand reduction

DSR LIMEJUMP LTD Conditional TS27
Inactive • 2022-23 (T-4), 2019-20 (T-1)
NEWTON ON TRENT WW, LN1 2JT (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Loading map...
Showing 25 locations