Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4099 unique locations (22954 components) - Page 160 of 164

Asda Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.30 MW
ASDA Adel, Holt Road, Leeds, LS16 7RY (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.30 MW
Asda ADC, Foxbridge Way, Normanton, WF6 1TL (12 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.13 MW
Asda Accrington, Hyndburn Road BB5 1QR (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW
Asda Aberdeen Beach, Unit 1 Beach Boulevard Retail Park Links Road AB24 5EZ (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW
Asda Aberdare, Riverside Retail Park, Aberdare, CF44 0AH (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.30 MW
Asda Abbey Park, Abbey Park London Road CV3 4AR (8 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.25 MW
Arundel Park, Connor Downs, Hayle, TR27 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Arundel Gardens, Doncaster, DN5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Arthurstone Gardens, Meigle, Blairgowrie, PH12 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Arthur Rice Close, Newhall, Swadlincote, Derbyshire, DE11 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR (9 components)

Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.07 MW
Ark Data Centres, Cody Park, Old Ively Road, Farnborough, GU14 0LH (3 components)

6MW - 6.9MWh Battery Energy Storage System (2)

DSR BRYT ENERGY LIMITED Not Prequalified GU14
Active • 2025-26 (T-4), 2022-23 (T-1)
14.12 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO1 2TT (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-4), 2023-24 (T-1)
1.05 MW
Ardagh Group - Doncaster Site 4, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.18 MW
Ardagh Group - Doncaster Site 3, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.18 MW
Ardagh Group - Doncaster Site 2, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.18 MW
Ardagh Group - Doncaster Site 1, Barnby Dun Road, Wheatley, Doncaster, South Yorkshire, DN2 4RH (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.18 MW
Ardagh Group - Barnsely Site 2, Burton Road, Monk Bretton South Yorkshire S71 5RP (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.18 MW
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.57 MW
Ardagh Glass, Portland Place, Irvine KA12 8JA (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
36.65 MW
Ardagh Glass, Headlands Lane, Knottingley WF11 0HP (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.24 MW
Aplin Way, Isleworth, TW7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Anstiebury Close Beare Green, Dorking, Dorking, Surrey, RH5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Annie Street, Lancashire, Accrington, Lancashire, BB5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Loading map...
Showing 25 locations