Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4099 unique locations (22954 components) - Page 164 of 164

AB10 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.05 MW
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (8 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.72 MW
44-48 E Dock St, Dundee DD1 3JS (7 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.69 MW
3 Kelvin Way, West Bromwich B70 7LH United Kingdom (2 components)

Industrial sites (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
0.30 MW
37 Wenlock Way, Leicester LE4 9HU (4 components)

bus depot (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.62 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-4), 2023-24 (T-1)
0.21 MW
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.54 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (11 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.07 MW
2 Snaith Rd, Pollington, Goole DN14 0AT (1 component)

Load from industrial process

Active • 2025-26 (T-1)
0.40 MW
2 Ford St, Coventry CV1 5WT (6 components)

1.2MW Battery Storage located at National Express Coventry (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2.73 MW
2 Bar Lane, York, YO51 9LS (60 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
123.45 MW
28th Avenue, Yorkshire, Hull, HU6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
2600 John Smith Drive, Oxford, OX4 2JY (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.76 MW
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
2.01 MW
20 Marine Esplanade, Leith Docks, EH6 7LU (1 component)

1X diesel generator with a gross capacity of 2.900MW

Active • 2025-26 (T-1)
2.00 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (21 components)

Office site with behind the meter generation (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
11.38 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.32 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (11 components)
• 0.39MW Battery Storage located at Newport Bus depot (2)
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
6.14 MW
150 Maylands Ave, Hemel Hempstead Industrial Estate, Hemel Hempstead HP2 7DF (3 components)

3MW - 3,45MWh Battery Energy Storage System (2)

DSR BRYT ENERGY LIMITED Not Prequalified HP2
Active • 2025-26 (T-4), 2022-23 (T-1)
7.06 MW
133 Balornock Road, Glasgow, G21 3UW (16 components)

Generators on hospital site (3)

Active • 2024-25 (T-1), 2023-24 (T-4) ...
45.47 MW
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active • 2027-28 (T-4)
13.78 MW
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
1.09 MW
100 Cathcart Rd, Glasgow G42 7BH (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.48 MW
Loading map...
Showing 24 locations