Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

12894 unique locations (87583 components) - Page 164 of 516

Padeswood Works, Chester Road, Padeswood, Mold, CH7 4HB (4 components)

Onsite demand reduction and load shifting at cement works

Inactive • 2021-22 (T-4), 2020-21 (T-1)
Padeswood Works, Chester Road, Mold, Flintshire, CH7 4HB (8 components)
• Proven reduction of site consumption
• Site is Load Reduction / DSR Turn Down
Active • 2025-26 (T-1), 2023-24 (T-4) ...
Padeswood (13 0005 3536 398). Distribution ID: 816 Padeswood Works Mold, CH7 4HB (3 components)

On site demand reduction for Padeswood

Inactive • 2022-23 (T-1)
Paddock Wood, Prudhoe, NE42 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Paddock Wood Prudhoe NE42 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
PADDOCK VIEW WHORLTON BARNARD CASTLE DL12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.42 MW
PADDOCK SWEEMING LANE, LITTLE FENTON, SHERBURN IN ELMET, LEEDS, LS25 (6 components)

EV charging on residential premises

Inactive • 2023-24 (T-1), 2022-23 (T-1)
14.02 MW
PADDOCK SWEEMING LANE LITTLE FENTON SHERBURN IN ELMET LEEDS LS25 (7 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2024-25 (T-1) ...
28.04 MW
paddocks malting lane litlington royston hertfordhire SG8 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
PADDOCKS CRAWLEY WINCHESTER HAMPSHIRE SO21 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Paddock Drive Chelmsford Essex CM1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
PADDOCK CLOSE GREAT LINFORD MILTON KEYNES MK14 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
21.60 MW
Paddington Green Campus, London, W2 1NB (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
PADDICK DRIVE LOWER EARLEY READING RG6 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
PA9 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.08 MW
PA8 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
65.92 MW
PA75 (4 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
14.08 MW
PA72 (2 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
7.04 MW
PA7 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
85.70 MW
PA67 (2 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
7.04 MW
PA64 (2 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
PA6 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
35.32 MW
PA5 8UA (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
PA5 8PY (2 components)

bus depot site

Active • 2025-26 (T-4)
PA5 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
16.75 MW
Loading map...
Showing 25 locations