Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7305 unique locations (73836 components) - Page 165 of 293

Essella Road, Ashford, Kent, TN24 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Eskvale Crescent, Penicuik, EH26 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Esholt Avenue Leeds West Yorkshire LS20 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
Epwell Grove, Northumberland, Cramlington, NE23 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
EnviroWales - Ebbw Vale - Site 2, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
EnviroWales - Ebbw Vale - Site 1, Plateaux 1 & 2 Rassau Industrial Estate Ebbw Vale Blaenau Gwent NP23 5SD (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ENTERPRISE LANE, CAMPBELL PARK, MILTON KEYNES, MK9 (7 components)

EV charging on residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK9
Active • 2026-27 (T-4), 2025-26 (T-4) ...
ENTERPRISE LANE CAMPBELL PARK MILTON KEYNES MK9 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
ENO, PORT OF TILBURY ADM, TILBURY DOCKS, TILBURY, ESSEX, RM18 7JR (6 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Endeavour Place, Stourport-on-Severn, England, DY13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
EN9 (13 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
EN8 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.02 MW
EN7 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.07 MW
EN6 (39 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
133.89 MW
EN5 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.23 MW
EN4 (31 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
EN3 (3 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
EN2 (30 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.19 MW
EN11 (6 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.02 MW
EN10 (18 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.02 MW
EN1 (8 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
EMR Willesden, 106 Scrubs Ln, London , NW10 6QY (18 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Wandsworth, Private Sidings, Pensbury Pl, Nine Elms, London , SW8 4TR (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Swindon, Bridge House, Gipsy Lane, Swindon, SN2 8DZ (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Swindon, Bridge House, Gipsy Lane, Swindon , SN2 8DZ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 25 locations