Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7305 unique locations (73838 components) - Page 167 of 293

EMR Hartlepool, Thomlinson Road, Longhill Ind Estate, Hartlepool, TS25 1NS (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Gloucester, Gloucester Works, Byard Road, Gloucester , GL2 5DF (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Glasgow, Barclay Curle Complex, 739 South Street, Glasgow , G14 0BX (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Erith, Manor Road, Erith, DA8 2AD (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Edmonton, Kenninghall Road, London, N18 2PD (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Eccles, Irwell Park Wharf, Lankro Way, Eccles, Manchester, M30 0SA (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR East Tilbury, Low Street Brickworks, Station Road, East Tilbury , RM18 8QR (20 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Darlaston, Bentley Road South, Darlaston, WS10 8LW (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Cardiff (Roath Dock), Dowlais Wharf, Dowlais Wharf, CF10 4ED (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Canning Town, 29 Bidder Street, London, E16 4SZ (29 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4) ...
EMR Brentford, Transport Avenue, Brentford, TW8 9HF (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Bradford, Planetrees Road, Laisterdyke, BD4 8AE (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Blaydon, Tynedale Works, Blaydon-on-Tyne, NE21 5RZ (20 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Bedford, Cauldwell Walk, Bedford , MK42 9DT (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Ashford, Cobbs Wood Industrial Estate, Ashford, TN23 1EL (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Emirates Stadium, Hornsey Road, London, N7 7AJ (7 components)

Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Emirates Stadium, Hornsey Road London N7 7AJ (8 components)

Battery system installed at Emirates Stadium

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Emirates Stadium, Hornsey Road, London, N7 7AJ (3 components)

Battery located behind the meter within football stadium, able tor educe imported electricity and/or export to the local network

Active • 2027-28 (T-4), 2023-24 (T-1) ...
Emirates Stadium, Hornsey Road London N7 7AJ (3 components)

Battery system installed at Emirates Stadium

Active • 2027-28 (T-4), 2023-24 (T-1) ...
Emirates Stadium, Hornsey Rd, London, N7 7AJ (14 components)
• Battery located behind-the-meter within football stadium, able to reduce imported electricity and/or export to local network
• Battery system installed at Emirates Stadium
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Elm Street, Errol, Perth, PH2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
ELMS FARM, DESFORD ROAD, ELMS FARM, LEICESTER, LEICESTERSHIRE, LE9 2BL (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Elms Avenue, Ramsgate, CT11 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Elm Park Great Britain HA7 4DA (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Loading map...
Showing 25 locations