Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

13509 unique locations (95618 components) - Page 173 of 541

Northways Porthcawl Mid Glamorgan CF36 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
North Walsham STW, NORTH WALSHAM STW, Marshgate, NORTH WALSHAM Norfolk, NR28 9LG, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
North View Hungerford Berkshire RG17 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
NORTH VIEW CRESCENT EPSOM SURREY KT18 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Northumbrian Water Plc Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

2 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Northumbrian Water Plc Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (2 components)

2 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
NORTHUMBRIAN WATER, OVINGHAM PUMPS, FEEDER 2, NON PAF N, OVINGHAM, PRUDHOE, NORTHUMBERLAND, NE42 6HL (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
14.00 MW
NORTHUMBRIAN WATER LTD, TEESDOCK ROAD, BRAN SANDS, MIDDLESBROUGH, 66KV IMPORT, TS6 6UE (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
1.63 MW
NORTHUMBRIAN WATER, BLACKWELL PUMPING STATION, CROFT ROAD,DARLINGTON, DL2 2SD (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
28.00 MW
Northumberland Road, Newburn, NE15 8SF (1 component)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4)
NORTH SWEEMING COURT, SHERBURN IN ELMET, LEEDS, LS25 (7 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
14.02 MW
NORTH SWEEMING COURT SHERBURN IN ELMET LEEDS LS25 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
28.04 MW
North Stroud Lane, Petersfield, Hampshire , GU32 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
NORTH STREET WETHERBY LS22 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
NORTH STREET PENNINGTON LYMINGTON HAMPSHIRE SO41 (2 components)

EV charging at residential premises

Active • 2026-27 (T-4)
North Street, Castle Acre, King's Lynn, PE32 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
6.86 MW
NORTH STREET BURWELL CAMBRIDGE CAMBRIDGESHIRE CB25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
102.70 MW
NORTHSIDE BIRTLEY CHESTER LE STREET DURHAM DH3 (2 components)

EV charging at residential premises

Active • 2026-27 (T-4)
North Shoebury Road, Shoeburyness, SS3 8DA (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
North Road, Torpoint, Cornwall, PL11 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
North Road, Sleaford, NG34 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
North Road Nottingham Nottinghamshire NG11 (2 components)

EV charging at residential premises

Active • 2027-28 (T-4)
14.29 MW
North Road, Halstead, Essex, CO9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
8.23 MW
North Road, Boldon Colliery, NE35 9AR (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
North Rd, St Thomas, SA1 8NZ PLease see note in other metering section (1 component)

load curtailment at site

Inactive • 2022-23 (T-3)
Loading map...
Showing 25 locations