Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4950 unique locations (27148 components) - Page 190 of 198

Welland Road, Hilton, Derby, DE65 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wellington Road, Attleborough, NR17 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wells Croft, Broadbridge Heath, Horsham, RH12 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wellview Lane, Livingston, EH54 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Welsby Terrace, St Cleer, Liskeard, Cornwall, PL14 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Wembley Road, Moorends, Doncaster , South Yorkshire, DN8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
W End Rd, Benington, Boston PE22 0EJ, United Kingdom (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2021-22 (T-1)
WESSEX WATER P/S, BUSHES ROAD, BLANDFORD, DT11 8US (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
WESSEX WATER RADIPOLE PS, RADIPOLE LANE, WEYMOUTH, DORSET, DT4 9RN (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
West Carr Lane, Hull HU7 0BS, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Westcliffe Road, Ruskington, Sleaford, Lincolnshire, NG34 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (3 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Westfield Cottages, Sipson Lane, Hayes, Greater London, UB3 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
West Lane, Ellistown, Coalville, Leicestershire, LE67 1FA (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Westmorland Way, Newton Aycliffe, County Durham, DL5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Weston Close, Upton Grey, Basingstoke, RG25 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
West Pennard, Glastonbury, BA6 8NN (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Westra, Dinas Powys, CF64 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WEST ROAD, NEWCASTLE UPON TYNE, NE15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Westrow Road, Southampton, SO15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
West Stour, Gillingham, Dorset, SP8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
West Street, Soberton, Southampton, SO32 3PH (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Loading map...
Showing 25 locations