Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4950 unique locations (27148 components) - Page 194 of 198

WOODHAM WALTER PUMPING STATION, LITTLE BADDOW ROAD, WOODHAM WALTER, MALDON , CM9 6RU (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
WOODHOUSE ROAD, TETTENHALL WOOD, WOLVERHAMPTON, WEST MIDLANDS, WV6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodland Close, Horsham, West Sussex, RH13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodland Drive, Hove, BN3 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (10 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Woodlands, Hazelbury Bryan, Sturminster Newton, Dorset, DT10 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodlands Lane, Quarndon, Derby, DE22 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WOODLANDS PARK, KENFIG HILL, BRIDGEND, MID GLAMORGAN, CF33 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wood Lane, Hinstock, Market Drayton, TF9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Wood Road, Polesworth, Tamworth, Staffordshire, B78 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodstock Road, Havant, PO9 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woolmers Lane, Letty Green, Hertford, Hertfordshire, SG14 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Worlds End, Forest Road, Hambledon, PO7 4QU (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (7 components)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WR1 (2 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.07 MW
WR10 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
WR11 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
WR13 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.01 MW
WR14 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
WR15 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
WR2 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.11 MW
WR3 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WR4 (4 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.12 MW
WR5 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
WR6 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.01 MW
Loading map...
Showing 25 locations