Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4950 unique locations (27148 components) - Page 197 of 198

AB14 (7 components)

Domestic EV charger (2)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.02 MW
AB12 (17 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.24 MW
AB11 (4 components)

Domestic EV charger

DSR
Active • 2024-25 (T-4), 2024-25 (T-1)
0.01 MW
AB10 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.05 MW
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (3 components)

Offsite with behind the meter generation (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
2.19 MW
6 Braham St Aldgate London E1 8EE (4 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
4.03 MW
6 Braham St Aldgate London E1 8EE (1 component)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2018-19 (T-1)
0.65 MW
670 Ajax Avenue, Slough, SL1 4BG (4 components)

DSR Component providing load turn down at a data centre (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.64 MW
64 Newman Street, London W1T 3EF (2 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
0.63 MW
5 Howick Place London SW1P 1WG (10 components)

The CMU component is an aggregation of turn-down and onsite generation (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
171.03 MW
5 Greenock Rd, Inchinnan, Renfrew PA4 9PG (8 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
5.72 MW
530 London Road Thornton Heath London CR7 7YE (5 components)

Hospital (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
26.13 MW
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (14 components)

Peak power plant (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
143.17 MW
44-48 E Dock St, Dundee DD1 3JS (7 components)

Bus depot site (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.69 MW
43 Devon Street, London, SE15 1AL (9 components)
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)
• Lithium ion battery storage at a material recycling facility in south east London.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.92 MW
3 Opal Way, Stone ST15 0BQ, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
3 Kelvin Way, West Bromwich B70 7LH United Kingdom (2 components)

Industrial sites (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
0.30 MW
37 Wenlock Way, Leicester LE4 9HU (4 components)

bus depot (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.62 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-4), 2023-24 (T-1)
0.21 MW
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Inactive • 2022-23 (T-1), 2021-22 (T-4)
0.21 MW
318 Edinburgh Rd, Brakes Newhouse, Motherwell, ML1 5SY, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.54 MW
301 Camberwell New Rd, Camberwell, London, SE5 0TF (11 components)
• 1.26MW Battery Storage located at Abellio Walworth depot
• Battery Storage and demand reduction located at Abellio Walworth bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.07 MW
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (4 components)

3 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
10.11 MW
2 Snaith Rd, Pollington, Goole DN14 0AT (1 component)

Load from industrial process

Active • 2025-26 (T-1)
0.40 MW
2 Princes Way Solihull West Midlands B91 2ES (2 components)

Embedded diesel generator at Princes Way site

Inactive • 2018-19 (T-1)
1.78 MW
Loading map...
Showing 25 locations