DSR (Demand Side Response)
851 unique locations (4194 components) - Page 2 of 35
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (5 components)
The CMU Component reduces import demand by turning on back up generation.
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (4 components)
The CMU Component reduces import demand by turning on back up generation.
West Street, Soberton, Southampton, SO32 3PH (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (5 components)
The CMU Component reduces import demand by turning on back up generation.
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (5 components)
The CMU Component reduces import demand by turning on back up generation.
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (3 components)
Flour & semolina milling business
West Carr Lane, Hull HU7 0BS, UK (6 components)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
WELTON WW, WELTON WW, Hackthorn Road, Welton, LINCOLN, LN2 3PT (5 components)
The CMU Component reduces import demand by turning on back up generation.
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom (14 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Weighbridge Road, Shotton, Deeside, CH5 2LL (14 components)
Paper mill industrial site
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (11 components)
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)
Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)
Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (17 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)
29MW of DSR
Wansford Intake, WANSFORD INTAKE, Track Off A47, Sutton, STAMFORD Lincolnshire, PE8 6PN, (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
WANSFORD INTAKE, WANDSFORD, PE8 6PN (2 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
WANSFORD INTAKE, WANDSFORD, PE8 6LG (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Walderton, Walderton Pumping Station, Walderton, PO18 9EE (2 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (10 components)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (8 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Uttons Drove STW, Uttons Drove STW, Off Andersons Road, Swavesey Road, CAMBRIDGE, CB24 4UQ, (5 components)
The CMU Component reduces import demand by turning on back up generation.
Uppingham STW, Sewage Treatment Works, Seaton Road, Uppingham, OAKHAM Leicestershire, LE15 9TX (5 components)
The CMU Component reduces import demand by turning on back up generation.
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)
19 MW of demand reduction