DSR (Demand Side Response)

7295 unique locations (73801 components) - Page 236 of 292

Brakes - Hemsworth, 18 Hoyle Mill Road, Kinsley, Pontefract, WF9 5EG (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Harlow, Flex meadow, Pinnacles Industrial Estate, Harlow, Essex, CM19 5TJ (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Grantham, Palmer Road, Grantham, NG32 2BW (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Eastleigh, Unit 41, Parham Dr, Eastleigh, SO50 4NU (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brakes - Aylesford, Unit A, Larkfield Trading Estate, New Hythe Lane, Larkfield, AYLESFORD, Kent, ME20 6SW (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
BRADWELL ROAD LOUGHTON MILTON KEYNES MK5 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
BRADWELL ROAD BRADVILLE MILTON KEYNES MK13 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Brackley Way, Basingstoke, Hampshire, RG22 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Bracken Park, Grimsby, DN33 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
BR8 (7 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
BR7 (15 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.06 MW
BR6 (49 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
175.01 MW
BR5 (20 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
BR4 (33 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
82.64 MW
BR3 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
159.69 MW
BR2 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
175.17 MW
BR1 (39 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
94.56 MW
BPI. Stretchfilms - Leominster, Worcester Road, Leominster, Herefordshire, HR6 0QA (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
BPI. Stretchfilms - Leominster, Worcester Road, Leominster, Herefordshire, HR6 0QA (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
BPI. Stretchfilms - Bridgwater, Bath Road, Bridgwater, TA6 4BF (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
BPI. Recycled Products - Heanor, Heanor Gate Road, Heanor Gate Industrial Estate, Heanor, DE75 7RG (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
BPI. Recycled Products - Heanor, Heanor Gate Road, Heanor Gate Industrial Estate, Heanor, DE75 7RG (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...