Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

7296 unique locations (73802 components) - Page 288 of 292

AL5 (101 components)
โ€ข Domestic EV
โ€ข Domestic EV charge point
โ€ข Domestic EV charger
DSR EV Charging Rejected AL5
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
342.94 MW
AL4 (72 components)
โ€ข Domestic EV charger (2)
โ€ข Domestic demand turn down
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
168.19 MW
AL3 (72 components)
โ€ข Domestic EV
โ€ข Domestic EV charger
โ€ข Domestic demand turn down
DSR EV Charging Rejected AL3
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
160.91 MW
AL2 (73 components)
โ€ข Domestic EV
โ€ข Domestic EV charger
โ€ข Domestic demand turn down
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
95.86 MW
AL10 (19 components)
โ€ข Domestic EV charger (2)
โ€ข Domestic demand turn down
Active โ€ข 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
AL1 (123 components)
โ€ข Domestic EV charge point
โ€ข Domestic EV charger
โ€ข Domestic demand turn down
Active โ€ข 2027-28 (T-4), 2025-26 (T-4) ...
273.15 MW
Akeman Road North Leigh Witney OX29 (12 components)

EV charging at residential premises (3)

Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
4.95 MW
Air Liquide, Coleshill Birmingham B46 1JY (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

Active โ€ข 2026-27 (T-4), 2023-24 (T-1)
14.36 MW
AIRFIELD WAY, WELDON, CORBY, NORTHAMPTONSHIRE, NN17 (12 components)

EV charging on residential premises (3)

Active โ€ข 2026-27 (T-4), 2025-26 (T-4) ...
0.61 MW
AIRFIELD WAY WELDON CORBY NORTHAMPTONSHIRE NN17 (12 components)

EV charging at residential premises (3)

Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
Airfield Way, Hucknall, Nottingham, NG15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active โ€ข 2025-26 (T-1)
0.00 MW
AINTREE ROAD CORBY NORTHANTS NN18 (12 components)

EV charging at residential premises (3)

Active โ€ข 2027-28 (T-4), 2026-27 (T-4) ...
0.61 MW
Aintree Drive, Downend, Bristol, South Gloucestershire, BS16 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active โ€ข 2025-26 (T-1)
0.00 MW
AFFPUDDLE, DORCHESTER, DORSET, DT2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active โ€ข 2025-26 (T-1)
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (9 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active โ€ข 2025-26 (T-4), 2024-25 (T-4) ...
0.61 MW
ADEL VALE LEEDS LS16 (6 components)

EV charging at residential premises (2)

Active โ€ข 2024-25 (T-1), 2023-24 (T-1)
Adel Park Drive Leeds LS16 (6 components)

EV charging at residential premises (2)

Active โ€ข 2024-25 (T-1), 2023-24 (T-1)
0.10 MW
ADEL MEAD LEEDS LS16 (7 components)

EV charging at residential premises (3)

Active โ€ข 2026-27 (T-4), 2024-25 (T-1) ...
0.01 MW
ADEL GREEN LEEDS LS16 (6 components)

EV charging at residential premises (2)

Active โ€ข 2024-25 (T-1), 2023-24 (T-1)
Adelaide Avenue Leeds West Yorkshire LS27 (4 components)

EV charging at residential premises (2)

Active โ€ข 2024-25 (T-1), 2023-24 (T-1)
0.07 MW
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane ,ย Wolverhampton, WV10 9QD (33 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
43.30 MW
ACS&T - Tewkesbury - Site 2, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active โ€ข 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 25 locations