Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

3926 unique locations (20920 components) - Page 3 of 158

ACS&T - Tewkesbury - Site 2, Newtown Trading Est/Green La, Tewkesbury GL20 8HD (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ACS&T - Wolverhampton - Site 2, ACS&T Logistics, Park Lane , Wolverhampton, WV10 9QD (27 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (5 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (5 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (5 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (5 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
AFFPUDDLE, DORCHESTER, DORSET, DT2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Aintree Drive, Downend, Bristol, South Gloucestershire, BS16 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Airfield Way, Hucknall, Nottingham, NG15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Air Liquide, Coleshill Birmingham B46 1JY (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
AL1 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.08 MW
AL10 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.02 MW
AL2 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
AL3 (20 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
AL4 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
AL5 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.03 MW
AL6 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.04 MW
AL7 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.03 MW
AL8 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.02 MW
AL9 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
0.03 MW
Albert Street, Leeswood, Mold, Clwyd, CH7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Alder Avenue, Jedburgh, TD8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Aldershot Road, Church Crookham, Fleet, GU52 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
ALEXANDRA ROAD, CHARLESTOWN, WEYMOUTH, DORSET, DT4 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...
Showing 25 locations