DSR (Demand Side Response)
851 unique locations (4194 components) - Page 3 of 35
Upminster STW, UPMINSTER STW, St Marys Lane, North Ockendon, UPMINSTER Essex, RM14 3PA (5 components)
The CMU Component reduces import demand by turning on back up generation.
Unproven DSR yet to be procured (46 components)
Unproven DSR yet to be procured
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (5 components)
Load reduction on site supported by non-exporting standby generation.
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (11 components)
Unit A, The Loddon Centre, Basingstoke, Hampshire, RG24 8QW (3 components)
Gas generators
Unit 6, Lime Kilns Business Park, Hinckley, Leicestershire, LE10 3EL (6 components)
Gas generators
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (5 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (5 components)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Unit 1 Carter Square, Uttoxeter, ST14 8EU (1 component)
Load curtailment from refridgeration
UCP Ltd - Norwich, Salhouse Road, Norwich NR7 9HL (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
Twinyards Farm Huthwaite Lane Alfreton DE55 5HX (2 components)
4.8MW of DSR
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (3 components)
5 MW of demand reduction
Tunstead Quarry (2), Waterswallows Road Tunstead House, Buxton, SK17 8TG (4 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)
2MW of DSR
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)
Load reduction on site supported by non-exporting standby generation.
Transport Yard near Entrance, Landwade Road, Exning, Newmarket, Suffolk, CB8 7NR (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (8 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
To be determined (77 components)
Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
To be confirmed - the components of the Unproven DSR CMU are to be determined. (2 components)
Industrial process flexibility delivering demand side response through reduced electricity imports
To be confirmed - the components of the unproven DSR are to be determined (2 components)
Industrial process flexibility delivering demand side response through reduced electricity imports
to be confirmed once the CMU components are known (17 components)
to be confirmed once the CMU components are known
To be confirmed once components are known (12 components)
To be confirmed once components are known
To be confirmed once CMU components are known (79 components)
To be confirmed once CMU components are known
to be confirmed once CMU components are known (2 components)
to be confirmed once CMU components are known