Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9553 unique locations (82890 components) - Page 35 of 383

TN24 (19 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.09 MW
TN23 (36 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
115.78 MW
TN22 (40 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
113.91 MW
TN21 (22 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.20 MW
TN20 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4)
0.04 MW
TN2 (35 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
92.05 MW
TN19 (10 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.11 MW
TN18 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.11 MW
TN17 (20 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.08 MW
TN16 (8 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
TN15 (45 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
154.94 MW
TN14 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.10 MW
TN13 (53 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
205.10 MW
TN12 (51 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
111.48 MW
TN11 (27 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
TN10 (16 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.09 MW
TN1 (4 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.00 MW
TIVERTON CRESCENT KINGSMEAD MILTON KEYNES MK4 (10 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK4
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Tivac Alloys Sheffield, 150 Blackburn Rd, Sheffield, Rotherham S61 2DW (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tivac Alloys Rotherham, 151 Blackburn Rd, Sheffield, Rotherham S61 2DW (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tinwell Intake, TINWELL INTAKE, Private road off Tinwell Road, (goes to business park) Tinwell, STAMFORD Lincolnshire, PE9 3UD, (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
TINWELL INTAKE, STAMFORD, PE9 3UD (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-1)
TINWELL INTAKE, STAMFORD, PE9 3UB (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4)
TINWELL INTAKE, STAMFORD, PE9 3JG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Tineings Shucknall Hereford Herefordshire HR1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
Loading map...
Showing 25 locations