Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9562 unique locations (83122 components) - Page 36 of 383

Tineings Shucknall Hereford Herefordshire HR1 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
25.38 MW
TIMOR GROVE, TRENTHAM, STOKE-ON-TRENT, STAFFORDSHIRE, ST4 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Timms Close, Horsham, RH12 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Timico Limited, Audley Avenue Industrial Estate, Newport, Shropshire, TF10 7BX, (3 components)

0.5MW - 0.5MWh Energy Storage System

DSR BRYT ENERGY LIMITED Not Prequalified TF10
Active • 2025-26 (T-4), 2022-23 (T-1)
0.39 MW
Tilstock Road, Whitchurch, SY13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TILLMAN CLOSE GREENLEYS MILTON KEYNES MK12 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.01 MW
Tiled House Lane, Brierley Hill, DY5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TILCON LTD, STATION YARD, WAKEFIELD ROAD, ACKWORTH, PONTEFRACT, WEST YORKSHIRE, WF7 7DF (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
64.84 MW
Tilbury STW, TILBURY-STW, Fort Road, TILBURY Essex, RM18 8UL, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.85 MW
Tilbury Freeport Tilbury Essex RM18 7HE (12 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.13 MW
Tilbury Freeport Tilbury Essex RM18 7HE (4 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2028-29 (T-4), 2023-24 (T-1) ...
7.13 MW
Tilbury Flour Mill, Tilbury Docks, Tilbury RM18 7JU (3 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2022-23 (T-1)
0.94 MW
Tilbury Docks, The Cement Terminal, Tilbury, Essex, RM18 7LA (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
3.57 MW
Tickmorend, Stroud, GL6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Thursfield Road, Tipton, West Midlands, DY4 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Thurrock Wharf, Thurrock Marine Terminal, Oliver Close, West Thurrock, Grays, Essex, RM20 3EE (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.31 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (10 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.61 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (3 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
1.44 MW
THORPE PARK GARDENS, LEEDS, LS15 (6 components)

EV charging on residential premises

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.02 MW
THORPE PARK GARDENS LEEDS LS15 (12 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
0.02 MW
THORPE DOWNS ROAD CHURCH GRESLEY SWADLINCOTE DERBYSHIRE DE11 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
THORPE COURT THORPE WATERVILLE KETTERING NN14 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Thorold Road, Ilford, Essex, IG1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Thornhill Road, South Marston, Swindon, SN3 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
THORNHILL GARDENS, BURNOPFIELD, NEWCASTLE UPON TYNE, Durham , NE16 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...
Showing 25 locations