Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9562 unique locations (83122 components) - Page 380 of 383

204 Lavender Hill Clapham Junction SW11 1JG (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
204-206 West End Lane West Hampstead Great Britain NW6 1SG (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
5.69 MW
1 Welbeck Avenue , Blackpool, FY4 4ES (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
34.73 MW
1 Tryst Road G67 1JW (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant (2)
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
532.52 MW
1 Thane Road West, Nottingham, NG2 3AA (125 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA (2)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
280.84 MW
1 Swan Walk Civic Centre, Manchester, M22 5HZ (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (13 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.53 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2287.59 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW. (2)
• N/A
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.87 MW
1 Monument Drive Robroyston, Glasgow, G33 1AD (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
1 Market Street Chapeltown, Sheffield, S35 2UW (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
1 Dewhurst Road Birchwood WA3 6PG (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
1 Battle Road Silver Hill TN37 7AA (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
1 Alexander Grove Kingshill ME19 4SZ (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
19 Selbourne Walk Shopping Centre E17 7LS (6 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
19 Bouverie Place CT20 1AU (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
195 Aylesone Rd, Leicester LE2 7QJ (33 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
4.26 MW
184 Loughborough Road NG2 7JA (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
18-20 Langthwaite Rd, South Kirkby, Pontefract WF9 3AP (3 components)
• Load reduction
• Load shedding
Active • 2025-26 (T-4), 2017-18 (T-1)
0.20 MW
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (3 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
2.39 MW
17 Hallam Road FK5 3DB (2 components)

Load drop (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
0.06 MW
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (12 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.76 MW
173 High Street, Cheltenham, United Kingdom, GL50 1DF (3 components)

Import/Export metering with diesel generation at a retail store (2)

Inactive • 2020-21 (T-1), 2017-18 (T-1)
0.87 MW
Loading map...
Showing 25 locations