Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

851 unique locations (4194 components) - Page 4 of 35

To be confirmed (41 components)

To be confirmed

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TN28 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
TN20 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
Tivac Alloys Rotherham, 151 Blackburn Rd, Sheffield, Rotherham S61 2DW (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Tinwell Intake, TINWELL INTAKE, Private road off Tinwell Road, (goes to business park) Tinwell, STAMFORD Lincolnshire, PE9 3UD, (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
TINWELL INTAKE, STAMFORD, PE9 3UD (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
TINWELL INTAKE, STAMFORD, PE9 3JG (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
TILCON LTD, STATION YARD, WAKEFIELD ROAD, ACKWORTH, PONTEFRACT, WEST YORKSHIRE, WF7 7DF (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Tilbury STW, TILBURY-STW, Fort Road, TILBURY Essex, RM18 8UL, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Tilbury Flour Mill, Tilbury Docks, Tilbury RM18 7JU (2 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2022-23 (T-1)
Thurrock Wharf, Thurrock Marine Terminal, Oliver Close, West Thurrock, Grays, Essex, RM20 3EE (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
THE STRINDS, OLD RADNOR, PRESTEIGNE, POWYS, LD8 2RN (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-1)
The Loddon Centre, Basingstoke RG24 8QW, UK (1 component)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Inactive • 2018-19 (T-1)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (2 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an industrial scale.
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
5.41 MW
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
TD7 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
TD11 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
TBD (30 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Load reduction upon instruction
DSR GRIDBEYOND LIMITED Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
TBC - as this is an unproven DSR CMU we will determine the components from the Tata Steel UK estate. (1 component)

Manufacturing process within the Tata Steel estate ( specific installations to be confirmed )

Inactive • 2018-19 (T-1)
tbc (21 components)

Aggregate CMU from multiple sources

Inactive • 2023-24 (T-4), 2022-23 (T-3)
TBA (23 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TA9 3QG (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations