Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4950 unique locations (27148 components) - Page 5 of 198

Aintree Drive, Downend, Bristol, South Gloucestershire, BS16 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Airfield Way, Hucknall, Nottingham, NG15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Air Liquide, Coleshill Birmingham B46 1JY (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
9.57 MW
Ajax Avenue, 670 Ajax Avenue, Slough, SL1 4BG (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW
AL1 (54 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.30 MW
AL10 (13 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.07 MW
AL2 (29 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.24 MW
AL3 (48 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.34 MW
AL4 (31 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.17 MW
AL5 (67 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.38 MW
AL6 (31 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.17 MW
AL7 (17 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.29 MW
AL8 (7 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.06 MW
AL9 (18 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.08 MW
Albert Street, Leeswood, Mold, Clwyd, CH7 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Alder Avenue, Jedburgh, TD8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
0.41 MW
Aldershot Road, Church Crookham, Fleet, GU52 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
ALEXANDRA ROAD, CHARLESTOWN, WEYMOUTH, DORSET, DT4 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (11 components)

Crystal glass recycling facility. (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.64 MW
Alexandria Drive, Middleton St. George, Darlington, DL2 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Alfreton Blocks, Bluebell Close, Clover Nook Industrial Estate, Alfreton, Derbyshire, DE55 4RA (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.94 MW
Allington Drive, Wrexham, Clwyd, LL13 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
ALLINGTON GARDENS, NAILSEA, BRISTOL, BS48 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
0.01 MW
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
0.07 MW
Loading map...
Showing 25 locations