DSR (Demand Side Response)
9911 unique locations (84020 components) - Page 50 of 397
TF2 (34 components)
TF11 (23 components)
TF10 (35 components)
TF1 (39 components)
Tewkesbury Road, Cheltenham GL51 9DT , United Kingdom (10 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
TETBURY DRIVE WITNEY OXFORDSHIRE OX28 (12 components)
EV charging at residential premises
Terringes Avenue, Worthing, BN13 (1 component)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Tennyson Road, Romford, Essex, RM3 (1 component)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
TENNYSON ROAD, GREAT YARMOUTH, NORFOLK, NR30 (1 component)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Tenderah Road, Helston, Cornwall, TR13 (1 component)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Tenby Grove Kingsmead Milton Keynes Buckinghamshire MK4 (9 components)
EV charging at residential premises
Tenax Road, Trafford Park, Manchester, M17 1JT, United Kingdom (10 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Temple Sowerby, Penrith, Cumbria, CA10 (1 component)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Templegate Avenue, Leeds, West Yorkshire, LS15 (2 components)
Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
TEMPLAND CROSSMICHAEL CASTLE DOUGLAS DUMFRIES & GALLOWAY DG7 (3 components)
EV charging at residential premises
Telford Forge Retail Park Colliers Way Great Britain TF3 4AG (1 component)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
TEESWATER CLOSE LONG LAWFORD RUGBY WARWICKSHIRE CV23 (3 components)
EV charging at residential premises
Tees Valley Nursery, The Moat, Billingham, TS23 4ED (3 components)
Industrial load that is independently metered and controllable via SCADA. Load can be operated for 8+ hours.
(TEESSIDE), ORMESBY PUMPING STATION, MIDDLESBROUGH, CLEVELAND,TS7 9JH (2 components)
On site reduction in consumption (2)
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan SA13 2PG (8 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Tedeco - Water Street, Kenfig Industrial Estate, Water Street, Port Talbort, West Glamorgan, SA13 2PE (1 component)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.