Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84020 components) - Page 51 of 397

Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PG (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PE (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Team Valley Eleventh Avenue Tyne and Wear Great Britain NE11 0NJ (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Teal Farm Village Tyne And Wear Great Britain NE38 8TJ (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
TD9 (7 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TD8 (8 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.01 MW
TD7 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
TD6 (17 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TD5 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.05 MW
TD4 (4 components)

Domestic EV charger

DSR
Active • 2024-25 (T-4), 2024-25 (T-1)
TD3 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
0.04 MW
TD2 (4 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
TD15 (15 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.03 MW
TD14 (5 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TD12 (7 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TD11 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2024-25 (T-4) ...
0.04 MW
TD1 (4 components)

Domestic EV charger

Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.01 MW
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
DSR GRIDBEYOND LIMITED Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.69 MW
tbc (21 components)

Aggregate CMU from multiple sources

Inactive • 2023-24 (T-4), 2022-23 (T-3)
TBA (23 components)

Unproven DSR Component

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TAYLORS LANE STEWKLEY LEIGHTON BUZZARD BEDFORDSHIRE LU7 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
TAYLORS FIELDS BANWELL WESTON SUPER MARE BS29 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Tavistock Road, Launceston, Cornwall, PL15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Loading map...
Showing 25 locations