Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84020 components) - Page 52 of 397

Tavern Lane, Newnham Bridge, Tenbury Wells, WR15 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TAVERNER CLOSE OLD FARM PARK MILTON KEYNES MK7 (19 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Taunton Close, Sleaford, Lincolnshire, NG34 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tarset, Hexham, Northumberland, NE48 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TARNSIDE ROAD ORRELL WIGAN LANCASHIRE WN5 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Tangley Park Road Hampton Nursery Lands Middlesex Great Britain TW12 3YZ (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Tan Dderwen LL16 (3 components)

EV charging at residential premises

Active • 2027-28 (T-4)
0.04 MW
Tame Street, West Bromwich, B70 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TAMARISK WAY WESTON TURVILLE AYLESBURY BUCKINGHAMSHIRE HP22 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Talveneth, Pendeen, Penzance, TR19 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Talton Crescent, Prestatyn, Clwyd, LL19 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TALLINGTON WW, PE9 4RJ (9 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Talland Avenue Fishermead Milton Keynes MK6 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Talke ST7 1TU (3 components)

Industrial sites

Active • 2025-26 (T-1), 2024-25 (T-1)
Talbot Road Leeds West Yorkshire LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
TALBOT ROAD LEEDS LS8 (6 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
Tadworthy Road, Northam, Bideford, EX39 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
TACKFORD CLOSE CASTLE BROMWICH BIRMINGHAM WEST MIDLANDS B36 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
TA9 3QG (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA9 (18 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
TA8 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
TA7 (40 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
105.67 MW
TA6 3JS (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 (30 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.11 MW
Loading map...
Showing 25 locations