Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84020 components) - Page 53 of 397

TA5 2AW (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 (9 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.08 MW
TA4 2UN (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.08 MW
TA3 7PE (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 (22 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.09 MW
TA24 6PJ (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.08 MW
TA23 0YA (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 (1 component)

Domestic EV charger

Active • 2025-26 (T-4)
TA22 (4 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
0.01 MW
TA21 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.13 MW
TA20 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TA2 (25 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.01 MW
TA19 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
0.09 MW
TA18 (10 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.01 MW
TA16 (3 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TA15 6UT (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA14 (3 components)

Domestic EV charger

Active • 2024-25 (T-4), 2024-25 (T-1)
0.03 MW
TA13 (6 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
TA12 (2 components)

Domestic EV charger

DSR
Active • 2024-25 (T-4), 2024-25 (T-1)
TA11 (15 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.03 MW
TA10 (8 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.13 MW
TA1 (42 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
112.75 MW
Loading map...
Showing 25 locations