Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9556 unique locations (82891 components) - Page 59 of 383

SP3 (12 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.04 MW
SP2 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
SP11 (44 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
180.31 MW
SP10 (32 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
140.77 MW
SP1 (13 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.10 MW
Sowton Industrial Estate, Kestrel Way, Sowton Industrial Estate, Exeter EX2 7LN, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sowton Industrial Estate, Kestrel Way, Sowton Industrial Estate, Exeter EX2 7LN (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2026-27 (T-4), 2023-24 (T-1)
Sowell Street, Broadstairs, Kent, CT10 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
SOVEREIGNS WAY, BLETCHLEY, MILTON KEYNES, MK2 (9 components)

EV charging on residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Sovereign Flour Mill, Brunel Rd, CORBY, Northants, NN17 4SL (5 components)

Flour Mill

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SOUTH WESTON THAME OXFORDSHIRE OX9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
South View, Clara Vale, Ryton, NE40 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
South Street, Peterborough, PE1 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
South Street Cottingham North Humberside HU16 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
South Road, Stourbridge, DY8 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
SOUTH MILTON KINGSBRIDGE DEVON TQ7 (7 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified TQ7
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (3 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
SOUTH LAWNE BLETCHLEY MILTON KEYNES MK3 (9 components)

EV charging at residential premises

DSR EV Charging P3P Partners LLP Not Prequalified MK3
Active • 2027-28 (T-4), 2026-27 (T-4) ...
South Knighton Road Leicester Leicestershire LE2 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Southfields, Lincolnshire, Bourne, Lincolnshire, PE10 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Southend STW, SOUTHEND STW, Eastern Avenue, SOUTHEND-ON-SEA, SS2 5QF (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
SOUTH END BEDALE DL8 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
SOUTH CHESTERS MEDWAY BONNYRIGG MIDLOTHIAN EH19 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Southbrook Close Glossop Derbyshire SK13 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Loading map...
Showing 25 locations