Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

851 unique locations (4194 components) - Page 6 of 35

Stagstone Farm, Maidenhill Road, Penrith. CA11 8SH (3 components)

8MW Battery Storage facility located at Maidenhill Road, Penrith

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Stagecoach Services Limited, Plumstead Depot, Stagecoach In London, Pettman Crescent London, SE28 0BJ (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Stagecoach Group Plc, Bus Garage Newtown Road, Nuneaton, CV11 4HR (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP1 5AQ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
SPROUGHTON-RIVER INTAKE WA , SPROUGHTON, IP1 5AQ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Sprites Hall WB, SPRITES HALL-WB, Spriteshall Lane, Trimley St. Mary, FELIXSTOWE Suffolk, IP11 9QY (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Speedwell Road, Parkhouse Industrial Estate, ST5 7RF, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Spalding STW, SPALDING STW, West Marsh Road, SPALDING Lincolnshire, PE11 2BB, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
SP5 3EU (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP3 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
Sovereign Flour Mill, Brunel Rd, CORBY, Northants, NN17 4SL (4 components)

Flour Mill

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southend STW, SOUTHEND STW, Eastern Avenue, SOUTHEND-ON-SEA, SS2 5QF (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Solar Farm High Meadow Farm Carlton Village Carlton Stockton-on-Tees Durham TS21 1EA (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Soberton, Southampton, S032 2PG (4 components)
• "Portsmouth Water Soberton, Southampton, S032 2PG The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2020-21 (T-1), 2017-18 (TR)
SN15 3QZ (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Slutchers Lane, Warrington WA1 1QY, UK (2 components)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Inactive • 2018-19 (T-1)
Slepe Farm Dorchester Road Lytchett Minster Pool Dorset BH16 6HS (10 components)
• 0.250 MW of demand reduction
• 2MW of DSR
• DSR turn down
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Sleaford STW, SLEAFORD STW, Bonemill Lane, SLEAFORD Lincolnshire, NG34 7DL, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Site Rowridge Rowridge Lane Rowridge Newport Isle of Wight" PO304HT (2 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
Sheffield Forgemasters, Brightside Ln, Sheffield S9 2RW (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4)
Sheepwash Lane, Aldingbourne Pumping Station, Chichester, PO18 0FA (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-1)
Semer WTW, Semer WTW, Hadleigh Road, Inbetween Semer/Nedging, IPSWICH, IP7 7HF, (4 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Seedy Mill Treatment Works Lichfield Road  Elmhurst  Lichfield  WS13 8HQ (4 components)

Back up diesel generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 25 locations