Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

851 unique locations (4194 components) - Page 7 of 35

Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)
• 3 MW of DSR
• 3 MW of demand reduction
• 3MW Battery Storage facility located at Scarborough
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Seaforth Mill, Liverpool, L21 4PJ (4 components)

Milling Motor Pelletizers, Fans etc

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SE6 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
SE26 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
SE21 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
SANDY HEATH MAINTENANCE CENTRE Sandy Potton Bedfordshire" SG192NH (2 components)

Battery/generator UPS

Inactive • 2018-19 (T-1)
Salvesen Way, Brighton Street Industrial Estate, Hull HU3 4XN, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Saltersford WTW, SALTERSFORD WTW - S1, Waterworks Office, Waterworks Lane, GRANTHAM Lincolnshire, NG31 7UL, (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Saltend Lane, HULL, HU12 8PP (25 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Saffron Waldon STW, SAFFRON WALDEN STW, Windmill Hill, SAFFRON WALDEN Essex, CB10 1BX (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, PE34 3AL (1 component)

The DSR is created by load management of the on site, twin stream, paper De-Inking Plant. Metering arrangements will measure the net reduction resulting from an instruction to reduce the …

Active • 2028-29 (T-4)
SA9 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
SA16 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
S65 (1 component)

Domestic demand turn down

Active • 2027-28 (T-4)
0.04 MW
Rushbrooke WS, RUSHBROOKE-WS, Rushbrooke Lane, BURY ST. EDMUNDS Suffolk, IP30 0ER (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Rushall WTW, RUSHALL WW, Waterworks Lane, Rushall, DISS Norfolk, IP21 4QG (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Runton STW, CROMER STW, Holt Road, CROMER Norfolk, NR27 9JR (5 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (9 components)

Chemical manufacturer

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
RUFFORD STORAGE, RUFFORD COLLIERY LANE, RAINSWORTH, MANSFIELD, NOTTINGHAMSHIRE, NG21 0HR (5 components)

6MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
RTW Depot, Roundtree Way, Norwich, NR7 8SQ (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Roydon Recycling Newport 1, Blackwood Business Park, Newport Rd, Pontllanfraith, Blackwood NP12 2XN, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Roydon & Ltd Swinton - Unit 1 Junction Eco Park,, Rake Lane, Swinton. M27 8LU, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (9 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
43.40 MW
Rotherham, (Aldwarke Works), Aldwarke Lane, Rotherham, South Yorkshire, S60 1DW (2 components)

Industrial Electricity Demand Reduction resulting in reduced electricity imports

Inactive • 2021-22 (T-4), 2020-21 (T-4)
ROOM SOUTH QUARRY, BROOM CROSS ROAD, STANFORD, SG18 9LB (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations