Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

6772 unique locations (73304 components) - Page 8 of 271

Whitwell, Worksop, Nottinghamshire, S80 3LJ (4 components)

LHOIST STEETLEY DOLOMITE

Active • 2025-26 (T-1), 2024-25 (T-1)
WHITTLE DENE T/W, HARLOW HILL, NEWCASTLE UPON TYNE,NON PAF ADDRESS, NE15 0 (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
WHITTINGTON CHASE KINGSMEAD MILTON KEYNES MK4 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WHITESHOOTS HILL BOURTON-ON-THE-WATER CHELTENHAM GLOUCESTERSHIRE GL54 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
White Rose Technology Centre, Don Pedro Avenue, Normanton, WF6 1TD (3 components)

0.5MW - 1.15MWh Battery Energy Storage System

Active • 2025-26 (T-4), 2022-23 (T-1)
White Lion Road, AMERSHAM, BUCKINGHAMSHIRE, HP7 (4 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2022-23 (T-1)
0.04 MW
WHITEGATE EAST KESWICK LEEDS LS17 (5 components)

EV charging at residential premises

Active • 2024-25 (T-1), 2023-24 (T-1)
WHITE GARTH BUBWITH SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Whalley Drive, Bletchley, Milton Keynes, MK3 (2 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WF9 (30 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.16 MW
WF8 (22 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.28 MW
WF7 (7 components)
• Domestic EV
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
WF6 (10 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
WF5 (30 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.10 MW
WF4 (59 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.21 MW
WF3 (41 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.21 MW
WF2 (32 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.18 MW
WF17 (29 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.11 MW
WF16 (5 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.12 MW
WF15 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
WF14 (21 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.04 MW
WF12 (20 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.16 MW
WF11 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.05 MW
WF10 (25 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.15 MW
WF1 (24 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.17 MW
Loading map...
Showing 25 locations