Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

9911 unique locations (84001 components) - Page 9 of 397

Woodcroft, Bishop Sutton, Bristol, BS39 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WOOD CLOSE THORPE WILLOUGHBY SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Woodchurch Road , Birkenhead, CH49 5PD (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Woodborough Road, Leicestershire, Leicester, LE5 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodbine Lane, Newbury, Berkshire, RG20 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Woodberry Down Hackney Great Britain N4 2SB (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Wolviston Court 14-16 Clifton Avenue Billingham Co Durham Great Britain TS22 5DE (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2025-26 (T-4)
Wolverton Road Stony Stratford Milton Keynes MK11 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
WOLVERTON ROAD, BLAKELANDS, MILTON KEYNES, BUCKINGHAMSHIRE, MK14 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
WOLVERTON ROAD BLAKELANDS MILTON KEYNES BUCKINGHAMSHIRE MK14 (9 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Wolverhampton Street, Bilston, WV14 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
WOLVERHAMPTON ROAD OLDBURY WEST MIDLANDS B68 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
0.01 MW
Wolverhampton Road , Oldbury, B69 4PU (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
Wolverhampton Road Heath Town, Wolverhampton, WV10 0QB (4 components)

Load curtailment

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (6 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
Wolstanton Retail Park ST5 0AP (2 components)

Load drop

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
1.64 MW
WN8 7UB (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
WN8 (24 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
0.19 MW
WN7 (13 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
WN6 (26 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.13 MW
WN5 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.10 MW
WN4 (7 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
0.05 MW
Loading map...
Showing 25 locations