Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4940 unique locations (26661 components) - Page 1 of 198

100 Cathcart Rd, Glasgow G42 7BH (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1020 SLUTCHERS LANE, WARRINGTON, WA1 1QL (3 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11 BURSOM ROAD, LEICESTER, LE4 1BS (1 component)

2.52MW Battery Storage located at PepsiCo Leicester factory

Active • 2024-25 (T-4)
132 Manchester Road, Carrington, Trafford, Greater Manchester, England, M31 4AY, (1 component)

Hydrogen Production plant consisting of three of 5.2MVA Electrolyser blocks with over 8hours of Hydrogen storage which each can flexible ramp up/down between 0% and 100% of load.

Active • 2027-28 (T-4)
133 Balornock Road, Glasgow, G21 3UW (13 components)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
150 Maylands Ave, Hemel Hempstead Industrial Estate, Hemel Hempstead HP2 7DF (3 components)

3MW - 3,45MWh Battery Energy Storage System

DSR BRYT ENERGY LIMITED Not Prequalified HP2
Active • 2025-26 (T-4), 2022-23 (T-1)
150 Maylands Avenue, Hemel Hempstead, Hertfordshire, HP2 7DF (2 components)

Back up generator at a data centre

Inactive • 2018-19 (T-1)
8.63 MW
150 Maylands Avenue, Hemel Hempstead, Herts, HP2 7DF (1 component)

DSR Component providing load turn down at a data centre

Inactive • 2021-22 (T-4)
12.95 MW
15-17 Deer Park Rd, Moulton Park Industrial Estate, Northampton NN3 6RX, United Kingdom (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
160 Corporation Road, Newport, Gwent, NP19 0WF (11 components)
• 0.39MW Battery Storage located at Newport Bus depot
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
172-174 Rye Lane PeckhamLondon, London, SE15 4NB (10 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
174 - 601 Farnham Road, Upper Froyle, Alton, GU34 4JD (9 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (2 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
195 Aylesone Rd, Leicester LE2 7QJ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (19 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.81 MW
20 Marine Esplanade, Leith Docks, EH6 7LU (1 component)

1X diesel generator with a gross capacity of 2.900MW

Active • 2025-26 (T-1)
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 component)

1x diesel generator with a total rated gross power capacity of 2.900 MW

Active • 2024-25 (T-1)
2600 John Smith Drive, Oxford, OX4 2JY (28 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
28th Avenue, Yorkshire, Hull, HU6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
2 Bar Lane, York, YO51 9LS (109 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 Ford St, Coventry CV1 5WT (6 components)

1.2MW Battery Storage located at National Express Coventry

Active • 2025-26 (T-4), 2024-25 (T-4) ...
2 Leeds City Office Park, Leeds, LS11 5BD (6 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
DSR Veolia UK Limited Conditional LS11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2 LIVINGSTONE BOULEVARD, HAMILTON INTNL TECHNOLOGY PARK, BLANTYRE, GLASGOW, G72 0BP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2020-21 (T-4), 2020-21 (T-1)
Loading map...
Showing 25 locations